We Have a Problem

We have a problem, after being framed I knew that it would look a little smaller but I decided to measure the room sizes anyway.  Somehow we lost 2′ 6″ from the depth/length of our basement/flex room.  Our downstairs bedroom is smaller and the stub for the plumbing is in the bedroom, not the bathroom.  Just one huge mess.  I sent our GC an email letting him know that it wasn’t acceptable and that we would like to meet with him ASAP.  Also noticed that the carport is smaller than what was noted on the plans.  GC wrote back that “we lost some space from the plans”.  No Shit!!  A lot of space and we’re having to bring it to your attention, I would think that you would have brought this up to us as soon as you discovered there might be an issue.  Were you not going to tell us?  Amazing!!!  His reasoning is that the elevations in the plans are wrong.  Ok, doesn’t make sense to me but I’m willing to listen, plus doesn’t it say on the plans to field verify all measurements and to notify the architect if the existing field conditions are different from what’s on the plan?  We’re meeting him on Saturday and I am beyond pissed.  This portion of the construction is new and we’re not constrained on any side for our footprint – we shouldn’t be that far off, a few inches I understand but 30″, no way!!

Update, just spoke with our architect, he said that our GC never called him with any questions or concerns.  He said that is quite normal for our GC and that he keeps telling him that if something doesn’t make sense to call.


Stone or Wood?

We received the revised kitchen plan back today from our designer and while we’re not there yet I feel that it’s getting closer.  We’re still trying to decide what to do with the kitchen island and whether to use marble or wood ($$$).  Who would have thought a wood surface would be so expensive?


Game Day

We sent our comments back to the designer today with regards to the kitchen layout.  We’re getting closer, just needs a little more tweaking.

More importantly, Framing began today!!!  Julie stopped by the house on the way to her office and was a little concerned.  To her it seems as if our GC was a little flustered.  Maybe but everybody gets a little nervous before a big game and this part of the renovation is probably equivalent to the kickoff.


Shingles aren’t all the Same Color?

Our GC emailed to let us know the framing material will be delivered today so they can begin tomorrow – we can’t wait!!!

He also needs to know the color of the shingles that we want for the house.  I’ve never really thought about it, I guess I’ve always just assumed that they were all the same charcoal color.  Of course Julie already knew exactly what color she wanted for the roof.  Thank you Julie!!!


Foundation is Poured

They poured the foundation today and it looks great!!  Max had the best time watching all of the big cement trucks as he made me stay to watch all 4 of them.  Thankfully he didn’t make me sit to watch it dry.  Next up, FRAMING!!!


Hope They Have What She Picked

Our GC said that we need to go by Specialty Tile to pick our selection, not sure why the change?  I’m sure that they’ll have the same selection but Julie did such a good job that if they can’t fulfill it then unfortunately we might have to go against our GC’s wishes.  At least it will give us the opportunity to go by and visit Builder Specialties and Fergusons to look at kitchen appliances again


Like the Attitude

We’re still trying to decide between a 36″ or a 48″ range for the kitchen.  We’re not big cooks so I don’t see a reason for the larger size, although I do agree with Julie that it would look great in our kitchen.  Big $$ difference between the two as well, this decision won’t be an easy one.

GC sent an email that they’ll be framing next week “come hell or high water” – love the attitude!!!


A Schedule

A lot of rain is schedule for this week however our GC told us that they’re planning to slab plumb today (Google), inspect Tuesday, slab prep Wednesday, inspect Thursday and pour the slab on Friday.  Yes!!! A schedule!!!