Morningside Renovation

Our Journey Through The Renovation Process Of Our Future "Forever Home" In Morningside (Atlanta,GA)


Save us Some Bricks

Nothing much to report however we did notice all of the bricks that will be removed from the existing house and thought that maybe we could find a way to use those, possible accent feature on an interior wall?  Who knows? We like the idea though.  Julie asked the GC if he could try to set them aside when they’re being removed.  His remark, “we’ll do what we can”.  Nothing more, nothing less.  I have a feeling it isn’t going to happen.  Great thought though and I would hate to see them go to waste.


Slabs

We went back to Bottega to look at the slabs Julie picked out for the kitchen.  Damby Mountain White Marble, I know it has to be a little over what we were budgeting but she’s done an amazing job staying at or below budget for everything else so hopefully we’ll have enough cushion to absorb the extra expense.  YOLO, right?

Due to all of the delays we did end up losing 1 of our 3 slabs that we had put on hold but we’re hopeful that 2 will be enough.  Plus, we would love to have a wood top for the island in the kitchen but that is super expensive!!!  I wish that we could find some reclaimed wood somewhere but I’m sure that it would still be $$$$.  Last comment for the day, I was totally blown away by Bottega’s selection, not the quantity but the actual pieces.  The slabs are  like God’s paintings, absolutely amazing and simply beautiful.


Not This Time

I’ve been continuing to ask our GC for the framing plan for the renovation and new addition as well as the roof, however he informed me today that his engineer doesn’t have the software to do it and they (GC & subs) would just design it in the field.  No Way!! I’ve seen how they “engineered” our framing in the past, I would be an even bigger fool if I let this happen again.  Fortunately he did suggest that we hire a structural engineer and have that person can check everything and if anything is found to be questionable then he would “re-do” it.  Sounds okay, I guess, but why not make sure we do it correctly the first time?  Also, don’t most engineers have software to aid in drawing their plan?  I’m sure that I could probably even find a free version/program online.


I’m Beyond Resentful

I’m sitting here tonight basically too pissed to even compose a simple entry.  I’m just so mad that we’re basically stuck with having to consider alternatives since we won’t be able to have an 8′ finished ceiling in the basement.  The basement ceiling was supposed to hide all of the HVAC as well as plumbing systems but because of either lack of supervision, knowledge or just plain not giving a sh!t our GC has now left us with no other choice.  He made the mistake and he should rip it up?  Not our GC, he continues to remind us that he doesn’t have the money to do so, forget the fact that he has been paid enough to take us through completion of framing and roofing.  We’re stuck!! No way out!!!  The architect is sending us options however we still won’t be able to achieve the ceiling height and we’ll need soffits.   I still feel that our GC should be responsible for digging it up and doing it correctly, plus it actually makes more sense financially.  It was on the plans, how can someone mess this up?  I just can’t say anything more tonight, too mad and feeling dejected.


We Pay For You Being Incompetent? Naw, Not Us!

So today Julie and I met with our GC at San Francisco Coffee Shop to discuss all of the issues going on at the house and how we can resolve them and hopefully move forward.  I prayed a lot before the meeting for the strength of silence and to be reasonable but from the moment he walked in it proved to be difficult.  Forget the fact that he was late and sat down with his arms crossed while leaned back in his chair, it was more of his defensive and aloof disposition while making us feel as if we were crazy and the ones being unreasonable that tried my patience as well as tested my limits. 

The purpose was to discuss and resolve the issue of the basement not being dug deep enough and how could we accomplish what was on the plans, an 8′ finished ceiling in the basement.  He was quick to shift the blame to everybody except him; architect, subs, property, etc… but when I pressed him further it basically came out that he measured/calculated the needed depth incorrectly and never came back to oversee the work of his subs.  While he was quick to pass the buck to everyone but himself, he is supposed to oversee the job, what really ticked me off was when we started discussing the various options that would bring us closer to that which is in the plans.  It was quickly obvious and then blatantly so when he informed us that he was not going to pay for his mistake.  If we wanted what was in the plans as well as discussed numerous times then it didn’t matter if he messed up, it would cost us extra, we would be the ones having to pay the extra money for a new joist system. I’m not sure if it was his arrogance or ignorance as to where his standing originated but after using a fairly elementary analogy we eventually had an agreement.  Basically it was decided that he would pay for the new joist system as well as take the construction through framing and roofing all under the guidance of a structural engineer hired by us.  After all was completed we would evaluate everything and decide at that time whether we would continue to move forward with him, my hope is that we would – probably stupidity, but I still want to believe in this guy. 

What got me was his parting shot, he had the nerve to tell us that we had to use him, that we “had no other option than to stick with him”, that we either would have to stick with him or sell it.  What an arrogant ass.  I thought we were moving forward and possibly starting to move forward despite his attitude but to level such a stark comment was beyond professional.

One other interesting fact from the meeting with our GC, I would think that he has a fairly good idea about our plans.  As we discussed the plans it came out that he had no idea that we were planning on connecting the existing and new basement, even though it is in the plans along with being discussed verbally and in emails numerous times.  He then arrogantly informed us how that couldn’t happen but quickly backed off as I showed him on a napkin that it was achievable.  I guess all of my experience of building a bird house when I was a kid paid off. 

How? How did we, No how did I let this happen?  How did I put us in this position?  I thought that we had done the needed due diligence, we talked with his references but the guilt of putting Julie and myself in this position is unexplainable.  I trusted him, thinking back there were little signs that I should have read, but this experience has become all of the bad you ever hear about dealing with contractors.   Sure, I blame him, but I blame myself. I feel that I’ve tried to except some of the mistakes but this one effects not only the functionality of the house but also the value. 

Sad thing is that he’s correct, we’re trapped.  He knows it and I truly feel that he’s taking advantage of it.


You Want Us to Pay For Your Mistakes?

Our GC informed us that he isn’t going to pay for a new joist system for the basement which would get us closer to achieving what was on the plan.  Basically he won’t even try to remedy his mistake even though it still wouldn’t be correct.  So he doesn’t dig the basement area deep enough to give us the ceiling height that was written in the plans and now our choice is to either accept his mistake and us have a ceiling that is significantly lower or “WE” have to pay for an alternative?  That makes absolutely no sense.  There was nothing preventing him from digging deep enough he just measured wrong and refuses to admit it or make it right and then he tells Julie that he doesn’t have the funds to dig it up and do it correctly – and how is this fair? How does he not have the funds?  It’s beyond scary that he has already spent all of the money that we fronted him which financially should have taken him through framing and roofing.

I so want to be done with him and would but we would be upside down since we’ve already given him a substantial amount of money that he told Julie he’s already spent on other jobs – we’re his hostage.  We’re stuck and this could have been prevented with a little supervision and probably just “some” knowledge.  And now Julie wants me to have a meeting with him?  I just don’t see a point.


But It Makes More Sense

I sent an email to our GC today asking for a copy of the mechanical plans, he said that isn’t done with residential construction and they always figure it out on-site?  Damn, that scares me every time he says something about figuring it out on-site. 

I mentioned that water was STILL getting into the back bedroom and that we would not be paying for any damage that this creates and that I’m expecting him to do so. 

Also, showed how it would make more sense financially for him to remove the basement slab that he incorrectly poured and do it the correct way as well as what was in the plans versus the new framing system and all of the other various modifications that will now need to be made.  I asked why he wouldn’t consider it and I’m anxious to receive his answer as it truly does make sense to start over. 

I’m starting to have concerns if the job is even doable financially from the numbers he provided us. I think that I’m going to have a couple of people look at them and give me their thoughts to see if it can be finished.  I just wonder why else he would be stalling? 

More great news – I found out that another completed job of his is unable to receive a Certificate of Occupancy because of code issues, and I heard about ANOTHER judgement in which he is in default.  Not sure if this is one of the ones I previously found out about but damn this is scary – what are we doing?  Julie keeps persuading me to give him an opportunity to let him make it right but I wonder if he has the ability to be able to do so?


I’m Really Trying

Our GC supplied us with 3 joist/flooring system alternatives since we won’t be able to use the originally designed system.  Still, none of these will give us what was in the plans with regards to ceiling height, why do I feel that I’m getting pressured into settling for something less than what was originally intended as well as highly achievable?  I’m trying to accept these options but it’s hard to get past that fact.