Our Journey Through The Renovation Process Of Our Future "Forever Home" In Morningside (Atlanta,GA)


Snakebit

The rest of the basement slab was poured however for whatever reason our GC decided not to pour the carport slab.  Almost funny that even the guys laying the concrete, laborers, were telling us that it wasn’t smart not pouring it all at one time and that it was going to cost us more money.  Maybe they should manage the financials for our GC.  Speaking of, he still won’t return calls or email from us or our Structural Engineer.  It would be great if he was a little more responsive but this has always been the case.

It rained a fair amount this week and we have discovered that the ceiling is collapsing in the kitchen and the ceiling and floor in one of our boy’s bedroom has been damaged beyond repair due to him continuing not to properly install a tarp even though we have told him about this issue numerous times.  GC still hasn’t been in our house, ridiculous. 

Also, our Structural Engineer informed us that as a result of the new foundation slab having to be cut to dig and pour footers (since the grade beams which were on the plans weren’t properly installed) she noticed that the slab is actually 2 1/2″ – 3 1/2″ thick in places instead of 4″ as the plans required.  She also discovered that the guys pouring the concrete didn’t lift the wire mesh resulting in it being on the bottom of the slab. Thankfully she insisted on the footings to carry the weight of the structure or we would have one hell of a mess in a few years since basically the main floor would collapse into the basement area. 

Last she also noticed that another grade beam, which was noted on the plans, was also not poured.  This means another area will need to be sawn out, excavated and poured properly.  I guess we won’t be able to go with a finished concrete floor since our slab is going to look like a checker board – a look we were leaning towards.

Good news is that our GC said that the framing material will be arriving on Monday and framing will begin on Tuesday. Yes!!!  Let’s go forward  – finally!!!

My constant question to myself – should we keep it or not?  This is driving Julie and I crazy and we’re questioning what we could have done differently. We thought we did our due diligence on the GC but he has continued to not only drop the ball but create further issues.  A lot is his lack of supervision and I believe knowledge of general construction along with not wanting to properly right a wrong, but I guess the question we keep asking is “are we just snakebit”? We’re going to talk to a few experts to see if we’re able to financially afford to keep going and honestly if it makes sense – I’m already scared about their answer.  Julie’s “forever home” has turned into a nightmare and I just don’t know if now we’ll ever be able to make it right as well as remove the tarnish.I feel crushed and basically beaten down.


Some Progress

So today the footings and rest of the walls connecting the existing structure with the new were poured. New Wall and Footings to Connect

It’s a hot one today but I’m so thankful that I’ve had so much wood to split and dirt to move – great way to take out my frustrations and feel as if I’m somehow moving things forward.


We Need You to Speed it up a Little GC

Due to both slabs being poured incorrectly we have had to get our Structural Engineer to design a new framing as well as roofing plan, versus “figuring it out in the field (extra cost to us).  It looks good but it’s going to require the GC to cut, excavate and pour new footings.  We have asked and are trying to get our GC to have this accomplished before the end of the week since our Structural Engineer is going out-of-town for several days.


A Little Quality Time Picking up Bricks

It was 90+ degrees but that didn’t stop Max from wanting to spend the morning with me picking up bricks that we’re hoping to salvage and reuse in our renovation.  We’ve asked our GC to try to save any bricks that weren’t broken however we soon discovered that didn’t happen so the two of us spent a few hours collecting wheelbarrow loads of bricks which had been scattered around the property as well as buried in the dirt which was excavated for the new foundation walls.

Not sure if it will last being that Max isn’t quite 4 yet, however currently he’s quite the worker – no slowing down, wants to stay busy and you have to make him take a break.  Half expected that the majority of the time I would be telling him “don’t do that”, “get back over here”,  “put that down”, “get off of that” – never once, just a father and son picking up bricks while talking about all that goes through a 3 1/2 year old’s mind.  Three hours of work and sweat that I wouldn’t give back for anything. I love being a dad!


Let’s put our Heads Together

Since our GC didn’t dig the basement deep enough we have had to go with an alternative for our joist system/floor system to get us closer to the originally planned ceiling height throughout the basement.  Being such there is a lot of nice joist material sitting on our property which we’ve been told will be trashed.  I hate that, seems like such a waste.  So, I asked our GC, Architect and Structural Engineer to see if they can find a way to utilize that material somewhere.  I’m hoping that they’ll find a way to use them, seems as if it would be a win – win for everyone.  We’ll see.


Let’s Keep It Going

Our Structural Engineer has been trying to reach our GC for 5 days to find out when they will pour the remainder of the form walls, core the drainage holes, drill (check) the slab for grade beams – still hasn’t been done, and pour the remainder of the slab.  A simple returned call, email or text would be appreciated.

(I did receive my Realtime Landscaping Plus 2012 software today and can’t wait to install it!!  Ok, a little premature in the process but I’m looking forward to trying to design the play area in the back for the boys as well as exploring the possibilities for the front yard.)


Another Delay, Trying to Have Patience

Our GC informed our Structural Engineer that it will be Monday before they start back on the project – nothing like letting 2 great days of weather pass by without taking advantage of them.  They’re suppose to do the rest of the underpinning on Monday, then move the incorrectly placed plumbing.  He did say that they will be in touch about drilling for the grade beams on Monday – curious as to what they will find. Does anyone want to place a bet?


Ok, Seems as if We’re Moving Forward

The form walls were poured today and our GC says that they will pour the new carport slab when they re-pour the portions of the basement slab.  I’m not holding my breath but that sounds good to me.