Our Journey Through The Renovation Process Of Our Future "Forever Home" In Morningside (Atlanta,GA)


Why Oh Why am I Not Surprised? Seriously Though?

Well, they drilled the foundation slab today to check for grade beams and guess what?  Yep, no grade beams!!  It mustn’t matter that they were in the construction plans and highly important, they just didn’t pour them.  Okay, now we’re getting past serious, he’s basically building a structure that could put my family and/or our friends in danger.  Forget for a moment the fact that 5-10 years down the road we would have all sorts of issues with a foundation that’s crumbling and walls collapsing, this mistake could seriously put my family at risk of injury or worse.  These were designed to support the family room above the kids play room, family room with a FIREPLACE.  Apologies for ranting but how do you miss these?  And you want more?  He wants to charge us for it – said that for him to change anything it would be considered a “change order“.  All of this is because he wouldn’t remove his original mistake. QUESTION, is there a word for someone who is beyond incompetent?

It only gets worse, the carport foundation (supposed to be retaining) wall which has already been poured twice isn’t deep enough, meaning that we will need to adjust the slab in the carport as well as the framing plan for the deck and outdoor room.  We asked the GC if he would remove it and pour a new one at the correct depth and as a retaining wall and of course he said no. 

And, we also found out on our own today that we will need a new water-line as well as sewer line due to roots. 

Our Structural Engineer is still trying to reach our GC to discuss the framing options but once again he said that he would have time to meet with her and every time she brings it up when they’re meeting about other items he always says that he has to go.  She’s basically doing this by herself, I guess he meant it the other day when responding to one of his subs he said ” I don’t know, she’s the one in charge”, referring to our Structural Engineer. 

And of course our GC and architect didn’t respond to my email asking for them to work with our Structural Engineer to design a framing plan to utilize all of the mis-ordered lumber that is sitting on our property  and basically going to waste.  I would just hate for all of this to be taken to a landfill.  As for our architect, I was a huge fan but that is starting to fade, I’m not sure what’s going on but from what I’ve been gathering there is absolutely no coordination or communication between him and our GC. 

Absolute last statement, it has always bugged me why our GC would work 2-3 days on our project and then move to another.  After talking with a few people in the industry it was their opinion that he is basically banking one job on another.  Working on a job and collecting a check once a certain phase is completed and then using that money to pay for the next job – similar to kiting a check.  Not sure if this is the case but it sure would make sense.

Enough for today, I’m done, worn out mentally and emotionally.


A Little Quality Time Picking up Bricks

It was 90+ degrees but that didn’t stop Max from wanting to spend the morning with me picking up bricks that we’re hoping to salvage and reuse in our renovation.  We’ve asked our GC to try to save any bricks that weren’t broken however we soon discovered that didn’t happen so the two of us spent a few hours collecting wheelbarrow loads of bricks which had been scattered around the property as well as buried in the dirt which was excavated for the new foundation walls.

Not sure if it will last being that Max isn’t quite 4 yet, however currently he’s quite the worker – no slowing down, wants to stay busy and you have to make him take a break.  Half expected that the majority of the time I would be telling him “don’t do that”, “get back over here”,  “put that down”, “get off of that” – never once, just a father and son picking up bricks while talking about all that goes through a 3 1/2 year old’s mind.  Three hours of work and sweat that I wouldn’t give back for anything. I love being a dad!


Let’s put our Heads Together

Since our GC didn’t dig the basement deep enough we have had to go with an alternative for our joist system/floor system to get us closer to the originally planned ceiling height throughout the basement.  Being such there is a lot of nice joist material sitting on our property which we’ve been told will be trashed.  I hate that, seems like such a waste.  So, I asked our GC, Architect and Structural Engineer to see if they can find a way to utilize that material somewhere.  I’m hoping that they’ll find a way to use them, seems as if it would be a win – win for everyone.  We’ll see.


There He Is

He responds, our GC let us know that the footings will be poured on Monday, foundation walls on Tuesday, plumber will be there on Wednesday and the slab will be poured on Thursday. He has no idea on when they will drill to make sure that they poured the necessary grade beams.  Isn’t this pretty close to the same schedule as last week?  I just looked, it is – seriously?  What kind of Mickey Mouse crap is this?  Aaauugh, I hate this feeling of being trapped and under the mercy of someone who we feel doesn’t even care, but we basically have no choice as he has our money and he’s told us that he doesn’t have the money to refund the difference.  Also, I’m really getting a very strong feeling that our GC and his concrete sub are doing everything they can to delay drilling for the grade beams, maybe they know that they didn’t include them when they poured the slab.


Happy 4th of July!!!

Our nation’s birthday, one of my favorite days; fireworks, family, kids laughing and playing, flags flying, great food and in the company of good friends.  Not this year though.  Our plans to host a July 4th party at our new house were of course canceled being that we’re no further along than shortly after we bought it 7+ months ago.  It certainly seemed possible when we were told in January that we would be in our new house in May but here we are putting on our happy faces and trying to make the best of it for our boys while basically feeling as if we’re being held hostage by our GC that rarely calls us back or returns emails.  Outside of today and this past weekend (although other contractors work on the weekend), we’ve gone 3 days without anyone working on our house and there are absolutely no holdups on our end. 

On top of that, my heart is breaking for Julie.  Forget the 4th, this house was something that she was so looking forward to eventually turning into our home, however every day seems to bring another disappointment.  What do I do?  How can I properly correct everything?  I can’t afford to replace our GC as the cost of removing all of his “improvements” and beginning again isn’t financially feasible?  Pray, think, research.  It seems as if that’s all that I ever do. I swear I feel as if I’m going crazy and I’m growing resentful for the time and energy that I’m expending on it which should be spent with my family.


Let’s Keep It Going

Our Structural Engineer has been trying to reach our GC for 5 days to find out when they will pour the remainder of the form walls, core the drainage holes, drill (check) the slab for grade beams – still hasn’t been done, and pour the remainder of the slab.  A simple returned call, email or text would be appreciated.

(I did receive my Realtime Landscaping Plus 2012 software today and can’t wait to install it!!  Ok, a little premature in the process but I’m looking forward to trying to design the play area in the back for the boys as well as exploring the possibilities for the front yard.)


Another Delay, Trying to Have Patience

Our GC informed our Structural Engineer that it will be Monday before they start back on the project – nothing like letting 2 great days of weather pass by without taking advantage of them.  They’re suppose to do the rest of the underpinning on Monday, then move the incorrectly placed plumbing.  He did say that they will be in touch about drilling for the grade beams on Monday – curious as to what they will find. Does anyone want to place a bet?


Ok, Seems as if We’re Moving Forward

The form walls were poured today and our GC says that they will pour the new carport slab when they re-pour the portions of the basement slab.  I’m not holding my breath but that sounds good to me.