The footings which will eventually be part of the foundation wall system to connect the existing house with the expansion were poured today. Yes!!!! Our Structural Engineer says they look great, however you would think that after all of the other previous bad pours and mistakes our GC would have been there to at least supervise. Nope, once again he left it to his subs. It is no wonder why we have had so many issues.
At least Max enjoyed seeing the cement truck, he was even able to press a button to extend the boom – what simple things that can make a 3 year olds day. At least he’s loving all of this and thankfully he’s too unaware of the sh!t storm his mom and I’ve been through with our GC throughout this whole process.
Being positive, while I’m still highly frustrated, at least we’re finally taking a step forward. Next up, foundation walls and then the slabs!!